Saturday 30 October 2010

Decisions, decisions

The focus of the work has moved indoors now. With that comes a sudden need for us to make decisions on a whole range of things that we really hadn't thought much about before.
  • What sort of internal doors do we want?
  • With which door handles?
  • What colour and design of skirting and architrave?
  • Blinds, curtains or shutters on the big window?
  • Design for the fitted wardrobe - external and internal?
  • Positioning of the shower heads and valves?
  • Design of the utility cupboard?
  • What type and colour of paving do we want for the verandah?
As well as decisions, we are having to arrange deliveries of the bits that we have bought directly - like bathroom tiles and furniture - so that they arrive to fit the builders' schedule. All of a sudden the project is less of a spectator sport than it was up to this point.

Fortunately, we are quite good at making decisions. Unfortunately, we are equally good at changing our minds about things a short time later!

Meanwhile, the boarding of the walls and ceilings is well under way.

 Bedroom walls

 Utility room ceiling - with hole for the light well

No comments:

Post a Comment